NMD and demand advisory
NMD and demand advisory
Periods above the line: 3
Illustrative example · not a measurement
Understand what drives the peak, what the supply agreement permits, and what the evidence supports.
A measured view of demand history, approaching-NMD warnings and peak contributors—with coverage attached.
Status
The method is still to be issued. This service line is not yet proved.
Problems it answers
- A demand charge that moves and nobody can say why.
- A penalty for going over notified maximum demand, found on the invoice.
- A notified maximum demand set years ago for a different plant.
- No way to see which half hour set the month's peak.
What you get
- Demand every half hour against your notified maximum demand.
- Every exceedance listed, with the half hour, the size and the coverage.
- The peak of the month, and what was running when it was set.
- A view of the headroom you pay for and do not use.
- Refusal, in words, for any period where readings are missing.
Designed and being built. Nothing here is in service yet.
How it works
- 1Read the meter
- 2Build true 30-minute demand
- 3Compare with the declared limit
- 4Show the result with its coverage
Where it fits
Energy advisory
Price measured energy against the rate in force and examine solar or storage plans without turning a model into a saving.
The methods are still to be produced. This service line is not yet proved.
IIoT solutions
A platform being built to bring readings from meters, machines and control systems at every site into one place, with alarms that reach a named person, energy priced at the tariff in force, and data faults shown as faults. Every part says whether it is live yet.
Live, being built, specified or planned—computed from the public Architecture page.
M&V
A written Option C method for testing a whole-facility result while preserving every refusal, input and correction.
Method issued. The engine is not built and the service line is not proved.
AI analyst
Ask a plain-language question and require the answer to cite the series, window, coverage and document it rests on.
The policy is still to be produced. This service line is not yet proved.
What it covers
Read the real interval
The integration period comes from the declared tariff and supply agreement. It is never assumed.
See the peak form
Measured demand history and bound sub-metered loads show which contributors formed a candidate peak.
Compare with headroom
A proposed NMD is a qualified comparison using declared look-back and headroom, not an approved change or saving.
BoundaryAxiom does not switch loads, apply to the utility, negotiate the NMD, or imply that a recommendation has been approved.