Manufacturing

The plant already records the answer. It is rarely in one place.

Most factories hold years of machine, energy and production data. The published research says the obstacle is not a shortage of tools but data that is incomplete, scattered or untrusted.

What the research finds

Three problems, each with its source.

Data that cannot be trusted

McKinsey lists insufficient, inaccessible or low-quality data as the first of four reasons predictive-maintenance programmes fail to scale beyond isolated pilots.

Source

McKinsey & Company, “Prediction at scale: How industry can get more value out of maintenance”, 2021 (opens in a new tab)

Figures are the publishers' own findings, with their own scope and dates. They are not Axiom measurements and are not a promise of any result on your site.

What we would measure

Readings, declared and qualified.

  • Per-line energy

    Sub-metered loads bound to declared lines and shifts, with coverage shown on every interval.

  • Peak contributors

    Which machines formed the half-hour that set the demand charge.

  • Gaps kept visible

    A missing interval is shown as missing. It is never filled to make a chart look complete.

Axiom reads plant data. It does not write to any PLC, drive or setpoint.

What your screen would show

Three views, on sample data.

  • Line demand against notified maximum demand

    kVAas of 14:30 SAST
    Notified maximum demand

    Illustrative example · not a measurement

  • Compressed air pressure, with its alarm

    Pump 3 · discharge pressure

    4.12bar

    Full

    as of 14:32 SAST

    Illustrative example · not a measurement

  • Energy per shift

    Off-peakStandardPeak

    Illustrative example · not a measurement

Tell us about your site and the question it needs answered.