Water & agriculture
Water that is not measured cannot be accounted for.
Pumping is often the largest energy cost on a farm or water scheme, and water itself is becoming scarcer and more regulated.
What the research finds
Three problems, each with its source.
- 40%
possible gap between global water demand and supply by 2030
Source
McKinsey & Company, “Transforming water economies”, 2009 (opens in a new tab) - 126 bn m³
global non-revenue water each year, about $40 billion
Source
World Bank, “What do private companies look for in a performance-based non-revenue water project?”, 2018 (opens in a new tab)
Demand may outrun supply
McKinsey, with the 2030 Water Resources Group, warned that without action global water demand could outstrip supply by up to 40% by 2030.
Source
McKinsey & Company, “Transforming water economies”, 2009 (opens in a new tab)Figures are the publishers' own findings, with their own scope and dates. They are not Axiom measurements and are not a promise of any result on your site.
What we would measure
Readings, declared and qualified.
Pump energy per volume
Pump electricity paired with flow, so the cost of each cubic metre can be read.
Tariff windows
Pumping hours shown against the time-of-use period they fall in.
Flow and level
Reservoir level and flow meters bound to declared assets, with gaps visible.
Axiom advises on pumping schedules. It never starts or stops a pump.
What your screen would show
Three views, on sample data.
Tank and dam levels
Tank 1 · level
71.4%
Fullas of 14:32 SAST
Illustrative example · not a measurement
Pump running state and pressure
Pump 3 · discharge pressure
4.12bar
Fullas of 14:32 SAST
Illustrative example · not a measurement
Pumping demand across time-of-use periods
Off-peakStandardPeak Illustrative example · not a measurement
Related service lines
IIoT solutions
A platform being built to bring readings from meters, machines and control systems at every site into one place, with alarms that reach a named person, energy priced at the tariff in force, and data faults shown as faults. Every part says whether it is live yet.
Live, being built, specified or planned—computed from the public Architecture page.
Energy advisory
Price measured energy against the rate in force and examine solar or storage plans without turning a model into a saving.
The methods are still to be produced. This service line is not yet proved.
Demand
Understand what drives the peak, what the supply agreement permits, and what the evidence supports.
The method is still to be issued. This service line is not yet proved.