Commercial property
Tenants, lenders and regulators now ask for the meter, not the brochure.
Energy has become a leasing and valuation question. Owners are asked to show performance per building and to separate landlord from tenant consumption.
What the research finds
Three problems, each with its source.
- 4–26%
electricity cost as a proportion of rental value
Source
JLL, “Value creation through energy smart, low-carbon buildings”, 2025 (opens in a new tab) - 5×
increase in retrofit rate JLL says is needed
Source
JLL, “Value creation through energy smart, low-carbon buildings”, 2025 (opens in a new tab)
Electricity is a large share of rent
JLL's 2025 research puts electricity cost at 4% to 26% of rental value across markets, making efficiency a competitiveness question for buildings.
Source
JLL, “Value creation through energy smart, low-carbon buildings”, 2025 (opens in a new tab)Figures are the publishers' own findings, with their own scope and dates. They are not Axiom measurements and are not a promise of any result on your site.
What we would measure
Readings, declared and qualified.
Landlord and tenant split
Sub-meters declared to a lease boundary, so each party sees its own consumption.
Generator and solar output
Backup and on-site generation measured, not estimated from run hours.
Before-and-after baseline
Twelve admitted months declared before a retrofit, under a written method.
Axiom reports building performance. It does not operate the BMS or claim a saving its method has not issued.
What your screen would show
Three views, on sample data.
Tenant sub-meters against the bulk meter
Main meter · demand
742.6kVA
Partialas of 14:30 SAST
Illustrative example · not a measurement
Demand by half hour
kVAas of 14:30 SASTNotified maximum demand Illustrative example · not a measurement
Generator running hours and fuel
Mains incomer · 14:00 to 15:0050 of 60 minutesA missing hour stays missing. Illustrative example · not a measurement
Related service lines
Energy advisory
Price measured energy against the rate in force and examine solar or storage plans without turning a model into a saving.
The methods are still to be produced. This service line is not yet proved.
M&V
A written Option C method for testing a whole-facility result while preserving every refusal, input and correction.
Method issued. The engine is not built and the service line is not proved.
Demand
Understand what drives the peak, what the supply agreement permits, and what the evidence supports.
The method is still to be issued. This service line is not yet proved.