Energy & utilities
Demand is changing faster than the data used to plan for it.
After two decades of flat demand, new loads and distributed generation are reshaping the grid. Planning and settlement depend on interval data that is complete and attributable.
What the research finds
Three problems, each with its source.
- 515–720 TWh
projected US data-centre demand by 2030 (Deloitte)
Source
Deloitte, “2025 Power and Utilities Industry Outlook”, 2024 (opens in a new tab)
Demand growth returns
Deloitte's 2025 outlook describes sustained demand growth from electrification, data centres and reshoring, after two decades of stagnant US demand.
Source
Deloitte, “2025 Power and Utilities Industry Outlook”, 2024 (opens in a new tab)Figures are the publishers' own findings, with their own scope and dates. They are not Axiom measurements and are not a promise of any result on your site.
What we would measure
Readings, declared and qualified.
Point-of-delivery intervals
Readings tied to a declared supply point and the tariff in force at the time.
Embedded generation
Solar and storage output measured separately from consumption.
Hashed statements
Each issued statement is fingerprinted so a third party can check it was not changed.
Axiom's dispatch and NMD outputs are advisory. It never controls an inverter, breaker or network asset.
What your screen would show
Three views, on sample data.
Energy flow: grid, solar, storage, load
Off-peakStandardPeak Battery plan
ModelledChargeDischarge Illustrative example · not a measurement
Inverter output, with coverage
Mains incomer · 14:00 to 15:0050 of 60 minutesA missing hour stays missing. Illustrative example · not a measurement
Device health: live, late, silent
- Gateway 1Livelast reading 14:32:05
- Flow meter 2Livelast reading 14:31:40
- Pump 3Latelast reading 14:28:12
- Cold room 2Silentlast reading 14:09:51
- Tank 1Livelast reading 14:32:01
- Main meterLivelast reading 14:30:00
Illustrative example · not a measurement
Related service lines
Energy advisory
Price measured energy against the rate in force and examine solar or storage plans without turning a model into a saving.
The methods are still to be produced. This service line is not yet proved.
Demand
Understand what drives the peak, what the supply agreement permits, and what the evidence supports.
The method is still to be issued. This service line is not yet proved.
M&V
A written Option C method for testing a whole-facility result while preserving every refusal, input and correction.
Method issued. The engine is not built and the service line is not proved.